Learning path · 20 lessons
Design a generation plant
Explain what serves the load, what limits the design, and what each delivered kilowatt-hour costs.
Start at the first lesson or jump to a question below. Each lesson has a plain explanation, a diagram you can change, and the calculation with its assumptions. No account or installation needed.
- 01Power and energySeparate the peak in kW from the energy in kWh.
- 02Load profiles and diversityBuild a demand curve from when customers use power.
- 03Solar resource and weatherRead irradiance, weather years and the time basis of a resource profile.
- 04Solar PV outputSee how sunlight, temperature and the inverter set delivered power.
- 05Battery power and energyA battery needs both enough discharge power and enough stored energy.
- 06Hybrid plant energy balanceFollow solar, storage and backup as they serve a day of demand.
- 07Diesel dispatch strategiesCompare load following and cycle charging on the same demand.
- 08Plant cost and LCOEConnect capital, operating cost and delivered energy over the project life.
- 09Site evidence and demandSeparate mapped buildings from surveyed customers and measured demand.
- 10Reliability and unserved energyMeasure how much demand goes unmet, and for how long.
- 11Plant sizing and Pareto frontsFilter feasible candidates before comparing cost and reliability.
- 12Renewable fraction and curtailmentFind why extra solar can create surplus instead of more useful supply.
- 13Sensitivity and weather riskTest a changed assumption and compare a set of resource cases.
- 14Tariffs, cash flow and financeConnect sales and collection to cash flow; distinguish tariff from LCOE.
- 15Plant sizing and network checksEnergy adequacy and acceptable voltage are separate design checks.
- 16Distribution network designFollow power from the source through feeders and service drops.
- 17Conductor size and network costCompare voltage drop and cost while holding the route fixed.
- 18Grid import, export and backupSee how connection limits and outages change energy exchange.
- 19Design versions and assumptionsKeep every result tied to the inputs and assumptions that produced it.
- 20Plant design worked exampleCompare a reproducible teaching day, then explain the next engineering checks.